Over the summer, we got around to renovating the kids' bathroom.  We originally wanted to start working on their bathroom at the beginning of the year, but it was a little difficult finding someone that was willing to do such a small job.  We finally found a contractor and then COVID hit.  Once restrictions were lifted a bit, the contractor's wife had a baby, so that delayed the work even more.  When we were able to settle on a start date, Danny ripped everything out of the bathroom; and aside from the bathtub, it was EVERYTHING.  We replaced the light fixture, vanity, countertop, mirror, toilet, faucet and shower head in the bathtub, installed a shower door, put shiplap on the walls, and installed a shelving unit above the toilet.  We removed all brushed nickel and replaced it with oil rubbed bronze.  We didn't do anything extravagant, but I'm glad we could update this little bathroom from 1999.  I love how it turned out!